Once an order has been placed with the Internet Service Provider (ISP), NetLink Trust will conduct a site survey to ascertain the extent of installation work and cost involved. The ISP will advise you on the cost involved and you will need to indicate your acceptance within 20 business days.
Should you choose not to proceed at this point, a cancellation charge will be imposed.
Upon acceptance of the cost advised by the Internet Service Provider, the turnaround time for service activation is typically about 40 business days. This includes getting approval from the relevant authorities, trenching works, laying the pipe, as well as fibre and service activation.
The installation cost is heavily dependent on the digging and trenching works involved in bringing the fibre to the location of the TP, and the conditions of the site. Hence, the ballpark costs involved for NBAP deployment would differ in each case.
NetLink Trust designs, builds, owns and operates the fibre network infrastructure which is the foundation of Singapore’s Nationwide Broadband Network.
COPYRIGHT © 2026 NETLINK TRUST.
ALL RIGHTS RESERVED.